Consortium Mania Sweeps 450mm Landscape


By Mark LaPedus In the mid-1990s, the semiconductor industry embarked on a costly and problematic migration from 200mm to 300mm wafer fabs. At the time, the 300mm development efforts were in the hands of two groups—Sematech and a Japanese-led entity. The equipment industry was on the outside looking in. And as a result, the migration from 200mm to 300mm fabs was out of sync and a nightma... » read more