More Manufacturing Issues, More Testing


Douglas Lefever, CEO of Advantest America, sat down with Semiconductor Engineering to talk about changes in test, the impact of advanced packaging, and business changes that are happening across the flow. What follows are excerpts of that discussion. SE: What are the big changes ahead in test? Lefever: It's less about inflection points and more like moving from algebra to calculus in the ... » read more

Building Bridges: A New DFT Paradigm


Over the last twenty years, structural testing with scan chains has become pervasive in chip design methodology. Indeed, it’s remarkable to think that most electronic devices we interact with today (think smartphones, laptops, televisions, etc.) contain hundreds to thousands of interconnected scan chains used to verify that the semiconductors were manufactured without defects. Because the imp... » read more

System-Level Test: Where Does It Fit?


Our second C-Brief discusses where system-level test (SLT) best fits into your semiconductor test workflow. With automated testing equipment (ATE), a traditional workflow may consist of: Wafer sort (WS) Burn-in after packaging (BI) Combination of structural testing (ST) and functional testing (FT). As demands on high-volume manufacturing shift in response to wider industry and com... » read more

Looking At Test Differently


Wilhelm Radermacher, executive advisor at [getentity id="22816" e_name="Advantest"], sat down with Semiconductor Engineering to discuss how the impact of rapid market changes, advanced packaging approaches and increasing complexity on test strategies and equipment. What follows are excerpts of that conversation. SE: As we move into new markets where use models and stresses on devices are dif... » read more

How Much Testing Is Enough?


As chipmakers move towards finer geometries, IC designs are obviously becoming more complex and expensive. Given the enormous risks involved, chipmakers must ensure the quality of the parts before they go out the door. And as part of quality assurance process, that requires a sound test strategy. But for years, IC makers have faced the same dilemma. On one hand, they want a stringent test me... » read more