Since the dawn of time for the EDA industry, the classic V diagram has defined the primary design flow. On the left hand side of the V, the design is progressively refined and partitioned into smaller pieces. At the bottom of the V, verification takes over and as you travel up the right-hand side of the V, verification and integration happens until the entire design has been assembled and valid...
» read more